Swan Lake Nature Sanctuary Boardwalk
Bradley Shuya Architect Inc. completed the design of the Phase 2 portion of the Swan Lake / Christmas Hill Boardwalk replacement in 2018. BSA previously designed the Phase 1 boardwalk replacement which was completed in the fall of 2015. The Swan Lake Christmas Hill Nature Sanctuary original boardwalks have been replaced with new aluminum structures incorporating reinforced plastic walkway surfaces and cedar handrails.